This project in Hixon involved the installation of brand-new sewage infrastructure to support improvements in local water quality. The works included the installation of new below-ground pipework, a below-ground storage tank, and associated above-ground pipework. In addition, new electrical equipment was installed to enhance the operation and control of the system.
The primary aim of the project was to improve the quality of the local watercourse, ensuring better environmental protection and long-term operational resilience for the area. This Included the installation of a new control panel, associated equipment & telemetry installation that will send signals to the main Control Room to remotely highlight any faults on the specific site.